Avelãs de Ambom / Pêra do Moço 40.6208° N 7.2285° W (Open the location in maps, opens in a new tab)
A biomethane plant!?
Not here!
The Câmara approved the plan in June. The mayor himself says he does not know who the owner is.
50,000 m²
of forest and farmland
REN
part of the site is in the National Ecological Reserve
HIGH
fire hazard on the site (high and very high)
±21.900
m³ per year
370 m
from Quinta Monte Frio
? t/yr
of waste to be treated Not disclosed
We are against
biomethane plants being built close to villages or homes, because:
We are not alone
There are dozens of biomethane projects in Portugal: DGEG has 42 with prior registration granted or under review. Several are contested by local people, from Torres Novas to Alenquer and Vila do Conde.
25 loads a day(Assumption)
The plant's trucks would have only two ways in: through Avelãs de Ambom or through Pêra do Moço. The animation shows one day at the conservative figure we assume, because the real number has not been disclosed.
24 + 26 (Assumption)
truck passages a day through Avelãs de Ambom and through Pêra do Moço (there and back). The capacity has not been disclosed: this is a conservative figure we assume.
≈ 89 dB(A)
at a house front 5 m(Assumption) away, from each passing truck: ≈ 60 dB above the typical night-time background(assumption: 5 m distance and typical night background, not measured in the villages).
60–95
truck movements a day at comparable plants in the UK (Stormy Down 60, Skipton-on-Swale 95). Our 25(Assumption) loads a day are a conservative figure, probably on the low side.
One day of trucks, in under a minute
Simulated time --:-- roads empty: fast-forwarding
Reduced motion: trucks shown still, spaced along the routes.
- Avelãs de Ambom: 0 of 24 passages today (Assumption)
- Pêra do Moço: 0 of 26 passages today (Assumption)
25 loads a day, half through each village, from 07:00 to 20:00. The clock speeds up when no truck is on the road. (Assumption)
area where each truck is ≥10 dB above the background noise (assumption: the 10 dB margin is a modelling choice)
Based on real data
Real or measured data
- Road routes (OpenStreetMap)
- Distances (MOV.AP measurements on satellite imagery)
- Guarda wind climatology (ERA5)
- Noise of comparable plants and trucks (published studies)
- Portuguese legal limits (General Noise Regulation)
- WHO road-traffic noise guideline values
Assumptions, flagged (Assumption)
- Assumption: 25 loads a day (capacity not disclosed)
- Assumption: Typical rural background noise (28–35 dB(A)), not measured in the villages
- Assumption: Split of trips between the two routes (50-50)
- Assumption: Truck working hours
- Assumption: Plant noise scenario (low, central, high)
- Assumption: Façade distance of 5 m
- Assumption: Truck speed (30 km/h in villages, 60 km/h outside)
- Assumption: Unloading time (45 min)
The numbers, the law and what to ask Try it in the simulator
What about water?
The parcel lies in the Côa sub-basin, where water is already scarce in summer. The animation shows one year around the parcel, with a scenario taken from real plants (Assumption).
96 %
water scarcity in August in the Côa sub-basin, where the parcel lies (APA's WEI+ index, 1989–2015 average). Over the whole year, 59 %: “severe scarcity”, APA's second-highest class. On the yearly figure, it is the most water-stressed sub-basin in the Douro river basin district.
≈ 106 m³ (Assumption)
of water a day in the “Central: Torres Novas-like” scenario (Assumption): the household use of about 1,180 people (Assumption). The promoter has not disclosed how much water the plant would use, or where it would come from.
0
groundwater-level stations within 30 km of the site. The nearest active one is about 53 km away; APA monitors the groundwater body as a whole.
The water year
Rain, evaporation, recharge and the water the plant could draw, month by month, around the parcel
At the end of the year
Recharge so far within 1 km (Assumption)
131,000 m³
Water drawn by the plant so far (Assumption)
38,800 m³
From April to October recharge is close to zero (Assumption): water drawn in those months would come out of groundwater stored in the fractured granite.
In this scenario, the plant could draw about 30 % of the recharge within 1 km (Assumption).
With mains water: about 1.8 % of authorised consumption in Guarda and 4.5 % of what the network loses to leaks (Assumption). The question then becomes water quality. The Caldeirão supply zone of the public mains includes Pêra do Moço.
average monthly rain at the site (Almeidinha) (Assumption) reference evapotranspiration (calculated for Guarda) (Assumption) in mm a month
Water scarcity (WEI+) of the Côa sub-basin (1989–2015 average): 59 % over the year, and each month's value.
Recharge so far within 1 km (Assumption) Water drawn by the plant so far (Assumption) in m³, at the end of each month
Water drawn by the plant so far (Assumption) in m³, at the end of each month
-
Jan
rain, mm: 100 evapotranspiration, mm: 22
WEI+ 24 %
Recharge so far within 1 km: 41,100
Water drawn by the plant so far: 3,300
no recharge
-
Feb
rain, mm: 95 evapotranspiration, mm: 31
WEI+ 29 %
Recharge so far within 1 km: 74,900
Water drawn by the plant so far: 6,300
no recharge
-
Mar
rain, mm: 57 evapotranspiration, mm: 54
WEI+ 40 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 9,600
no recharge
-
Apr
rain, mm: 68 evapotranspiration, mm: 70
WEI+ 46 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 12,800
no recharge
-
May
rain, mm: 66 evapotranspiration, mm: 98
WEI+ 68 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 16,000
no recharge
-
Jun
rain, mm: 37 evapotranspiration, mm: 122
WEI+ 85 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 19,200
no recharge
-
Jul
rain, mm: 15 evapotranspiration, mm: 143
WEI+ 93 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 22,500
no recharge
-
Aug
rain, mm: 11 evapotranspiration, mm: 130
WEI+ 96 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 25,800
no recharge
-
Sep
rain, mm: 41 evapotranspiration, mm: 87
WEI+ 93 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 29,000
no recharge
-
Oct
rain, mm: 92 evapotranspiration, mm: 49
WEI+ 63 %
Recharge so far within 1 km: 76,300
Water drawn by the plant so far: 32,300
no recharge
-
Nov
rain, mm: 107 evapotranspiration, mm: 27
WEI+ 43 %
Recharge so far within 1 km: 88,300
Water drawn by the plant so far: 35,500
no recharge
-
Dec
rain, mm: 100 evapotranspiration, mm: 20
WEI+ 25 %
Recharge so far within 1 km: 131,000
Water drawn by the plant so far: 38,800
no recharge
Based on real data
Real or measured data
- Measured rainfall (IPMA at Guarda; Almeidinha rain gauge)
- Official average recharge of groundwater body PT03A0X1, the one beneath the site (APA)
- Water scarcity (WEI+) of the Côa sub-basin (APA)
- Status of the groundwater body (APA)
- Yield of granite boreholes (Almeida et al., 2000)
- Population and ages of the villages (INE, 2021 Census)
- Water use and losses in Guarda and Avelãs de Ambom (ERSAR, INE)
- Water use of real plants (evaluation committee opinion and environmental impact study; design figures, not metered)
- Average water use in a European survey of anaerobic digestion plants (JRC reference document)
- Groundwater monitoring stations (APA)
- Catchments and streams (APA)
- Distance to the water extraction zone (MOV.AP measurement)
- Rainfall projections (RNA2100)
Assumptions, flagged (Assumption)
- Assumption: 25 loads a day (capacity not disclosed)
- Assumption: Load per truck and delivery days a year
- Assumption: Plant type and water use per tonne (scenarios from real plants)
- Assumption: Water source: borehole or mains (not disclosed)
- Assumption: Water drawn evenly through the year
- Assumption: Average recharge of the groundwater body applied to the site
- Assumption: Split of recharge across the months (simple soil-water model)
- Assumption: Rainfall at the site equal to Almeidinha's; evapotranspiration equal to Guarda's
- Assumption: Parcel location (±50 m)
- Assumption: Guarda's average household use applied to the villagers
- Assumption: Typical granite borehole yield, pumped 24 hours a day
Rain, groundwater and villages: the numbers and what to ask Methodology
What is a biomethane plant?
Bacteria break down organic waste in closed tanks, without oxygen. Gas comes out, and a residue is left: the digestate.
- Trucks bring the waste. In Guarda, all that is known is that it would be "non-hazardous organic waste".
- Reception and storage. This is the main source of odour at these plants.
- Digester. Without oxygen, bacteria produce biogas: 50–70% methane, 30–50% CO2 and a little hydrogen sulphide.
- Upgrading. CO2 and H2S are removed to get biomethane; some methane is lost on the way.
- Outputs. The biomethane goes into the gas grid; the digestate is spread on fields as fertiliser.
The risks
"This is not about fear. It is about responsibility." Tap a card to see the key point and its source.
-
Air and odours
In field inspections at biogas plants, odour was noticed 250–600 m away. Waste reception is the main source of odour.
-
Water
Digestate spills into rivers are the best-documented serious risk. At Châteaulin (France, 2020), about 180,000 people had tap-water restrictions for about 5 days.
-
Soil
Digestate is spread as fertiliser. Digestion does not remove heavy metals, and digestate from packaged food waste can carry microplastics.
-
Traffic and noise
At comparable plants, traffic studies forecast dozens of trucks a day. In Guarda the number has not been disclosed.
-
Leaks, fires and explosions
Across 13,171 European biogas stations there were more than 800 accidents in 10 years, most without serious consequences. Modelled effects usually stay within tens of metres.
-
House values
In France, rural methanisation units lowered nearby house prices by about 5% within 1 km. No effect was found beyond 1 km.
How serious these risks are depends on the location, the technology, the management and the distance to homes. That is why we ask for an environmental impact assessment before any decision.
How close is too close?
Other countries keep these plants away from homes by law. Compare with the distances measured from the parcel.
- Zona de exploração de água352 m
- Quinta Monte Frio370 m
- Quinta (a nascente)654 m
- Avelãs de Ambom (limite nascente)1,038 m
- Igreja de Pêra do Moço1,391 m
Minimum distances in other countries:
- France: 200 m
- England: 200 m
- England, with open-air composting: 250 m
- Germany, enclosed plant: 300 m
- Germany, open plant: 500 m
- Castilla-La Mancha (Spain): 2,000 m (draft decree)
Sources of the distances:
We found no fixed minimum distance in Portugal between these plants and homes. The law only requires digestate storage to be 25 m from third-party housing.
What has happened
-
The Câmara recognises the municipal public interest
-
The Assembleia Municipal's "positive opinion of intent"
-
Nothing more on biomethane in the minutes
-
No public consultation found
-
Next step
Planning and environmental licensing; no date yet for a public consultation.
Questions people ask
The questions we hear most, with answers and sources. Have another? Write to us.
What is a biomethane plant?
An industrial installation where bacteria break down organic waste in closed tanks without oxygen. It produces biogas, 50–70% methane, which is upgraded to biomethane for the gas grid; what is left, the digestate, is spread on fields as fertiliser.
Where exactly is it?
In the parish union of Avelãs de Ambom and Rocamondo, between Avelãs de Ambom and Pêra do Moço. The exact parcel has not been published. MOV.AP measured the parcel outline on satellite imagery; on the map its position is approximate.
Who is the promoter?
Lambert Bioenergy (Biometano Cosmos, Unipessoal Lda.). At a council meeting the mayor said he does not know who the owner is. A councillor said the proposal arrived by email from a Spanish company, "Lambert", and that the tax number belongs to another company. The company registry certificate was requested three times; the documents sent to councillors in August are not public.
Has the project already been approved?
No. The Câmara recognised the municipal public interest and the Assembleia Municipal gave a "positive opinion of intent". The mayor called it "a mere intention" and said urban-planning and environmental licensing are still to come. A biomethane plant needs prior registration with DGEG and environmental and planning licences before it can operate.
Will there be an environmental impact study?
It depends on the capacity, which has not been disclosed. An environmental impact assessment is mandatory from 100 t/day, or at any capacity in a sensitive area; below that, the need is assessed case by case.
Take part
Four ways to help, from the quickest to the most involved.
-
Follow
News and meetings on the movement's page.
Follow on Facebook (opens in a new tab) -
Sign
Two petitions: to the Assembleia da República and to Guarda's Câmara and Assembleia Municipal.
Sign the petition0 signatures
Petition to the Assembleia da República: 0 of 1,000 signatures
Next goal: 1,000 signatures, hearing and publication in the Diário da AR · 0 online · 0 on paper, only those collected by MOV.AP
-
Vote
One person, one vote, confirmed by email. The results are public.
Vote -
Get updates
Public consultations, sessions and news, by email. Unsubscribe at any time.
Subscribe
Sources on this page
- Ata da reunião ordinária da Câmara Municipal da Guarda de 19 de junho de 2026 (Ponto 18, Proposta VPCM n.º 10/2026)
- Unidade de Biometano de Sousel
- MOV.AP: medições sobre imagem de satélite, outubro de 2026 (distâncias do limite da parcela à zona de exploração de água, quintas e aldeias)
- Portugal quer cobrir 9% do consumo de gás com biometano até 2030
- Comissão de utentes convoca vigília contra unidade de biometano em Torres Novas
- Assembleia Municipal de Alenquer contra instalação de central de biometano
- Cerca de 200 moradores protestam contra central de biometano em Vila do Conde
- Rotas rodoviárias entre o local e as aldeias: extração Overpass, 17.10.2026
- Regulamento (UE) n.º 540/2014, anexo III: limites de ruído de veículos (N3, medição a 7,5 m)
- FHWA: níveis de ruído de passagem de camiões pesados (Lmax a 50 pés)
- REC: Noise Impact Assessment, Coursers Farm AD (AC100899-1R3)
- ISO 9613-2: atenuação do som na propagação ao ar livre (método simplificado)
- Redmore Environmental: Noise Impact Assessment, Rufford AD (ref. 1288-2)
- EPA Irlanda: documento de licença com ruído de fundo rural noturno (LA90 30–31 dB(A))
- Development Control Committee report P/14/700/FUL (digestão anaeróbia de Stormy Down)
- Skipton-on-Swale (North Yorkshire): central de digestão anaeróbia recomendada para aprovação, até 144 000 t/ano
- Climatologia do vento no local, 2021–2025: reanálise ERA5 através da Open-Meteo Historical Weather API (16 setores, velocidade, dia/noite)
- Decreto-Lei n.º 9/2007: Regulamento Geral do Ruído (art. 3, 11 e 13, anexo I)
- Environmental Noise Guidelines for the European Region (2018): tráfego rodoviário, Lden 53 dB e Lnight 45 dB
- Planos de Gestão de Região Hidrográfica, 3.º ciclo: serviços ArcGIS (massas de água, pressões, estado, WEI)
- Plano de Gestão da Região Hidrográfica do Douro (RH3), 3.º ciclo: Parte 2, Volume B
- Parecer da Comissão de Avaliação, procedimento de AIA n.º 3857: Unidade de Biometano de Sousel
- UPB Torres Novas: Estudo de Impacte Ambiental, Aditamento (T2025-0064-02-EIA-UPB-TRN-ADIT-00)
- Best Available Techniques (BAT) Reference Document for Waste Treatment (JRC113018)
- EIA da Unidade de Produção de Biometano de Ferreira do Alentejo: Aditamento (T2025-028-02-EX-ENV-EIA-ADIT-0), AIA 599
- Relatório Indicadores e Dados 2023 (RASARP 2024)
- População residente (estimativas anuais), indicador 0012918
- Estações de monitorização de águas subterrâneas (serviço ArcGIS)
- Plano de Gestão da Região Hidrográfica do Douro (RH3), 3.º ciclo: Fichas de Massa de Água, Volume I
- Aquíferos das Bacias Hidrográficas do Rio Tejo e das Ribeiras do Oeste (capítulo do LNEC, M. M. Oliveira)
- RASARP 2026, Vol. 2, Anexo III: Dados da qualidade da água (baixa), 2025
- Dados do controlo da qualidade da água para consumo humano: Zona de Abastecimento Caldeirão, 2.º trimestre de 2026
- GHCN-Daily POE00100963 Almeidinha (fonte ECA&D), 1959–1998
- Normal Climatológica da Guarda 1991–2020 (v1.0)
- Normais climatológicas da Guarda (082), 1971–2000
- Andrade e Ventura: Hargreaves-Samani vs Penman-Monteith em 20 estações portuguesas, Finisterra LIX(127) e33850
- Plano de Gestão da Região Hidrográfica do Douro (RH3), 3.º ciclo: Parte 2, Volume A
- Sistemas Aquíferos de Portugal Continental: Maciço Antigo, Introdução e Zona Centro-Ibérica (Almeida, Mendonça, Jesus e Gomes)
- População residente por lugar (censitário), sexo e grupo etário: Censos 2021, indicador 0011790
- População residente por local de residência, sexo e grupo etário: Censos 2021 e 2011, indicador 0011609
- RNA2100: Climate Projections, Extremes and Indices, Mainland Portugal (Supplementary Material)
- Bayle et al. (2018), Chemical Engineering Transactions, vol. 68, pp. 79–84: emissões de odor em três unidades de metanização em França
- Methane slip from biogas upgrading (apresentação)
- Empresa de biometano quer instalar-se na Guarda
- Frontiers in Sustainable Food Systems (2024): revisão sobre o uso agrícola do digerido
- Carta aberta à população
- Odour emissions impact of on-farm biogas production with co-digestion: a case study in four European farms
- 400 m³ de digestat dans l'Aulne à Châteaulin : Engie Bioz condamnée par la justice
- Weithmann et al. (2018), Science Advances 4: eaap8060: fertilizantes orgânicos como via de entrada de microplásticos no ambiente
- Kotek, Trávníček e Blecha (2015), Chemical Engineering Transactions 43: 1933–1938: acidentes em estações de biogás europeias
- Scénarios accidentels et modélisation des distances d'effets associées pour des installations de méthanisation de taille agricole et industrielle (rapport Ineris-201652-2437679-v2.0)
- Faulques, Bonnet e Bourdin (2025), Energy Economics 145: 108488: efeito das unidades de metanização no preço das casas em França
- Flash ARIA: Méthanisation, comment développer la filière sans développer les risques ?
- OpenStreetMap: localização das aldeias de Avelãs de Ambom, Pêra do Moço, Rocamondo, Martianes e Verdugal e da igreja de Pêra do Moço
- Arrêté du 12 août 2010 relatif aux prescriptions générales applicables aux installations classées de méthanisation relevant du régime de l'enregistrement (rubrique 2781), version consolidée
- SR2021 No 6: anaerobic digestion facility including use of the resultant biogas (installations)
- TA Luft 2021, n.º 5.4.8.6.2: distância mínima de 300 m para instalações fechadas de biogás (resumo num documento de licenciamento)
- Merkblatt DWA-M 372 (folha de correção): 300 m para instalações fechadas e 500 m para abertas
- Proyecto de Decreto sobre las plantas de transformación en biometano (documento de participación pública)
- Pesquisa documental do MOV.AP: distâncias mínimas entre centrais de biogás e habitações em Portugal (nenhuma regra encontrada)
- Portaria n.º 79/2022, de 3 de fevereiro (gestão de efluentes pecuários; o digerido de biogás é equiparado a efluente pecuário)
- A instalação de energias renováveis e de biometano no concelho da Guarda gerou, na reunião da Câmara Municipal, uma troca de argumentos sobre a necessidade da participação pública nos processos
- Portal de dados abertos da Câmara Municipal da Guarda: listagem de atas e deliberações
- Participa: portal de consultas públicas (pesquisa de consultas para este projeto)
- Ata da reunião ordinária da Câmara Municipal da Guarda de 10 de agosto de 2026
- Ata da reunião ordinária da Câmara Municipal da Guarda de 13 de julho de 2026
- Ata da reunião ordinária da Câmara Municipal da Guarda de 27 de julho de 2026
- Despacho Conjunto APA–DGEG n.º 1/2026 (sequência de licenciamento das unidades de biometano)
- Enquadramento Legal da Digestão Anaeróbia (nota técnica)
Ata da reunião ordinária da Câmara Municipal da Guarda de 19 de junho de 2026 (Ponto 18, Proposta VPCM n.º 10/2026)
Unidade de Biometano de Sousel
MOV.AP: medições sobre imagem de satélite, outubro de 2026 (distâncias do limite da parcela à zona de exploração de água, quintas e aldeias)
- No public link
Portugal quer cobrir 9% do consumo de gás com biometano até 2030
Comissão de utentes convoca vigília contra unidade de biometano em Torres Novas
Assembleia Municipal de Alenquer contra instalação de central de biometano
Cerca de 200 moradores protestam contra central de biometano em Vila do Conde
Rotas rodoviárias entre o local e as aldeias: extração Overpass, 17.10.2026
Regulamento (UE) n.º 540/2014, anexo III: limites de ruído de veículos (N3, medição a 7,5 m)
FHWA: níveis de ruído de passagem de camiões pesados (Lmax a 50 pés)
REC: Noise Impact Assessment, Coursers Farm AD (AC100899-1R3)
ISO 9613-2: atenuação do som na propagação ao ar livre (método simplificado)
- No public link
Redmore Environmental: Noise Impact Assessment, Rufford AD (ref. 1288-2)
- No public link
EPA Irlanda: documento de licença com ruído de fundo rural noturno (LA90 30–31 dB(A))
Development Control Committee report P/14/700/FUL (digestão anaeróbia de Stormy Down)
Skipton-on-Swale (North Yorkshire): central de digestão anaeróbia recomendada para aprovação, até 144 000 t/ano
Climatologia do vento no local, 2021–2025: reanálise ERA5 através da Open-Meteo Historical Weather API (16 setores, velocidade, dia/noite)
Decreto-Lei n.º 9/2007: Regulamento Geral do Ruído (art. 3, 11 e 13, anexo I)
Environmental Noise Guidelines for the European Region (2018): tráfego rodoviário, Lden 53 dB e Lnight 45 dB
Planos de Gestão de Região Hidrográfica, 3.º ciclo: serviços ArcGIS (massas de água, pressões, estado, WEI)
Plano de Gestão da Região Hidrográfica do Douro (RH3), 3.º ciclo: Parte 2, Volume B
Parecer da Comissão de Avaliação, procedimento de AIA n.º 3857: Unidade de Biometano de Sousel
UPB Torres Novas: Estudo de Impacte Ambiental, Aditamento (T2025-0064-02-EIA-UPB-TRN-ADIT-00)
Best Available Techniques (BAT) Reference Document for Waste Treatment (JRC113018)
EIA da Unidade de Produção de Biometano de Ferreira do Alentejo: Aditamento (T2025-028-02-EX-ENV-EIA-ADIT-0), AIA 599
Relatório Indicadores e Dados 2023 (RASARP 2024)
População residente (estimativas anuais), indicador 0012918
Estações de monitorização de águas subterrâneas (serviço ArcGIS)
Plano de Gestão da Região Hidrográfica do Douro (RH3), 3.º ciclo: Fichas de Massa de Água, Volume I
Aquíferos das Bacias Hidrográficas do Rio Tejo e das Ribeiras do Oeste (capítulo do LNEC, M. M. Oliveira)
RASARP 2026, Vol. 2, Anexo III: Dados da qualidade da água (baixa), 2025
Dados do controlo da qualidade da água para consumo humano: Zona de Abastecimento Caldeirão, 2.º trimestre de 2026
GHCN-Daily POE00100963 Almeidinha (fonte ECA&D), 1959–1998
Normal Climatológica da Guarda 1991–2020 (v1.0)
Normais climatológicas da Guarda (082), 1971–2000
Andrade e Ventura: Hargreaves-Samani vs Penman-Monteith em 20 estações portuguesas, Finisterra LIX(127) e33850
Plano de Gestão da Região Hidrográfica do Douro (RH3), 3.º ciclo: Parte 2, Volume A
Sistemas Aquíferos de Portugal Continental: Maciço Antigo, Introdução e Zona Centro-Ibérica (Almeida, Mendonça, Jesus e Gomes)
População residente por lugar (censitário), sexo e grupo etário: Censos 2021, indicador 0011790
População residente por local de residência, sexo e grupo etário: Censos 2021 e 2011, indicador 0011609
RNA2100: Climate Projections, Extremes and Indices, Mainland Portugal (Supplementary Material)
Bayle et al. (2018), Chemical Engineering Transactions, vol. 68, pp. 79–84: emissões de odor em três unidades de metanização em França
Methane slip from biogas upgrading (apresentação)
Empresa de biometano quer instalar-se na Guarda
Frontiers in Sustainable Food Systems (2024): revisão sobre o uso agrícola do digerido
Carta aberta à população
- No public link
Odour emissions impact of on-farm biogas production with co-digestion: a case study in four European farms
400 m³ de digestat dans l'Aulne à Châteaulin : Engie Bioz condamnée par la justice
Weithmann et al. (2018), Science Advances 4: eaap8060: fertilizantes orgânicos como via de entrada de microplásticos no ambiente
Kotek, Trávníček e Blecha (2015), Chemical Engineering Transactions 43: 1933–1938: acidentes em estações de biogás europeias
Scénarios accidentels et modélisation des distances d'effets associées pour des installations de méthanisation de taille agricole et industrielle (rapport Ineris-201652-2437679-v2.0)
Faulques, Bonnet e Bourdin (2025), Energy Economics 145: 108488: efeito das unidades de metanização no preço das casas em França
Flash ARIA: Méthanisation, comment développer la filière sans développer les risques ?
OpenStreetMap: localização das aldeias de Avelãs de Ambom, Pêra do Moço, Rocamondo, Martianes e Verdugal e da igreja de Pêra do Moço
Arrêté du 12 août 2010 relatif aux prescriptions générales applicables aux installations classées de méthanisation relevant du régime de l'enregistrement (rubrique 2781), version consolidée
SR2021 No 6: anaerobic digestion facility including use of the resultant biogas (installations)
TA Luft 2021, n.º 5.4.8.6.2: distância mínima de 300 m para instalações fechadas de biogás (resumo num documento de licenciamento)
Merkblatt DWA-M 372 (folha de correção): 300 m para instalações fechadas e 500 m para abertas
Proyecto de Decreto sobre las plantas de transformación en biometano (documento de participación pública)
Pesquisa documental do MOV.AP: distâncias mínimas entre centrais de biogás e habitações em Portugal (nenhuma regra encontrada)
- No public link