Public dossier The risks How many trucks? Not disclosed

Traffic and noise

At comparable plants, traffic studies forecast dozens of trucks a day. In Guarda the number has not been disclosed.

What is known

At a 48,500 t/yr food-waste plant in Bridgend (Wales), the council report speaks of an average of 60 heavy-vehicle movements a day; the traffic study gives 33 a day on average in the busy season and 102 at the peak. The same plant was approved to run 24 hours a day, 7 days a week. In Torres Novas the project would move about 300 t of feedstock a day. In Ireland a 90,000 t/yr plant was refused, among other reasons, because the local road was too small.

We found no noise studies specific to biogas plants. The noise sources are trucks, pumps, compressors, upgrading units and flares. In France, where ambient noise is above 45 dB(A), a classified installation may add no more than 5 dB(A) by day and 3 dB(A) at night; with ambient noise between 35 and 45 dB(A), the limits are +6 and +4 dB(A). These rules measure noise above the background: where the background is low, as in a quiet village, even a small increase is noticeable.

In Guarda

The capacity, tonnage and number of trucks have not been disclosed. We make no estimates of our own: the real number has to come from the project's traffic study.

What to ask the promoter

  • How many trucks a day, on normal days and in spreading seasons?
  • On which roads, and through which villages?
  • At what times do trucks arrive and leave? Does the plant run at night?

Noise and traffic: numbers, law and animation

Sign the petition All risks

Sources on this page

  1. Development Control Committee report P/14/700/FUL (digestão anaeróbia de Stormy Down) Bridgend County Borough Council (País de Gales) · 2015-02
  2. Ata da reunião ordinária da Câmara Municipal da Guarda de 19 de junho de 2026 (Ponto 18, Proposta VPCM n.º 10/2026) Câmara Municipal da Guarda · 19 Jun 2026
  3. Comissão de utentes convoca vigília contra unidade de biometano em Torres Novas Observador · 17 Jul 2026
  4. Permission refused for Kildare biomethane plant Farmers Journal (Irlanda) · 2025-10
  5. Arrêté du 23 janvier 1997 (ruído das instalações classificadas): limites de emergência citados num estudo acústico de licenciamento DREAL Bourgogne-Franche-Comté · consultado em 16.10.2026

See all sources