Public dossier Leiria · Portugal Updated 16.10.2026

Amor biomethane plant (Leiria)

In licensing Licensing started in 2024; in June 2026 it was awaiting permits before the environmental impact study. approximate location

A Genia Bioenergy project, with Repsol, for 400,000 t/yr of pig-farm and poultry effluent. The promoter hopes to finish construction in Q1 2028.

What we know

PromoterGenia Bioenergy (Espanha), com a Repsol
LocationAmor, Leiria (Leiria)
Capacity 400,000 t/yr of effluent
Feedstock Pig-farm and poultry effluent
Environmental impact assessment information not disclosed Not disclosed Not yet started (June 2026)

Repsol joined the project in 2024 with 40% of Genia. The plant would produce about 107–110 GWh/yr and about 300,000 t/yr of biofertiliser; the announced investment reached €53 million. A grid connection contract has been signed with Floene.

In June 2026 the project was awaiting permits before moving on to the environmental impact study. At an information session in 2024, more than 100 residents raised concerns about odours and trucks in Amor.

What has happened

  1. Repsol joins the project

  2. Residents' session
    More than 100 concerned residents.

  3. Awaiting permits
    Completion targeted for Q1 2028.

What we still don't know

  • Environmental impact assessment

On the map

Documents and links

All projects See the sources

Sources on this page

  1. Unidade de biometano em Amor aguarda por licenças para avançar com estudo de impacto ambiental Região de Leiria · 19 Jun 2026
  2. População preocupada com central de biometano em Leiria JN · 18 Apr 2024
  3. Repsol entra no projecto da central de biometano a construir em Amor Jornal de Leiria · 15 Apr 2024
  4. Genia Bioenergy and Floene connect biomethane project to the grid in Leiria Renewable Gas Show · sem data