Public dossier Benavente · Portugal Updated 16.10.2026

Benavente biomethane plant (Fizzy Break)

In licensing Environmental impact assessment (CCDR-LVT) "under review" since 1 June 2026. approximate location

An environmental impact assessment by Fizzy Break, Unipessoal, for 84,400 t/yr of livestock effluent and farm and agro-industrial waste.

What we know

PromoterFizzy Break Unipessoal, Lda
LocationBenavente, Benavente (Santarém)
Capacity 84,400 t/yr (≈ 232 t/day)
Public consultation 20.04–01.06.2026, 9 submissions

The plant would treat about 232 t/day and produce 3,508,338 Nm³/yr of biomethane. The public consultation ran from 20 April to 1 June 2026, with 9 submissions.

Possible duplicate. Ferbgás ("Benavente Bioenergy") and Gás da Terra have both announced projects in Benavente. It is not confirmed whether the Fizzy Break procedure on Participa and the Ferbgás project are the same project, so we show both.

What has happened

  1. Public consultation opens
    Until 1 June 2026.

On the map

Documents and links

All projects See the sources

Sources on this page

  1. Unidade de Biometano Participa / CCDR LVT · 2026-04-20 / consultado em 2026-10-16

See all sources