Abrigada biomethane plant (Marés, Alenquer)
A project by SGDT 1001, Unipessoal (presented as a Gás da Terra project) for about 84,000 t/yr of effluent and animal by-products, 400–500 m from homes. The Câmara gave an unfavourable opinion and the municipal assembly unanimously declared it of no municipal interest.
What we know
| Promoter | SGDT 1001, Unipessoal, Lda (projeto da Gás da Terra, segundo a imprensa) |
|---|---|
| Location | União das Freguesias de Abrigada e Cabanas de Torres (Marés), Alenquer (Lisboa) |
| Capacity | ≈ 84,000 t/yr (230 t/day) |
| Feedstock | Farm effluent and animal by-products |
| Distance to homes | 400–500 m |
| Câmara's opinion | Unfavourable |
| Public consultation | 19.08–29.09.2026, 417 submissions |
The plant would treat about 230 t/day (84,000 t/yr) of farm effluent and produce biomethane and a "biofertiliser", with a €20.5 million investment and about 7 direct jobs. The promoter expects the environmental impact decision in mid-2027.
The public consultation on Participa ran from 19 August to 29 September 2026, with 417 submissions. The Câmara Municipal gave an unfavourable opinion, citing undemonstrated odour control, road safety on the EN1/IC2 and the lack of analysis of alternative sites further from homes. Quercus also gave an unfavourable opinion.
The Movimento de Cidadãos de Abrigada, Marés e Ota gathered about 900 signatures on paper and 1,400 online, and about 100 people protested in September, joined by the mayor. On 24 September the municipal assembly unanimously declared the project of no municipal interest.
What has happened
-
Prior information request approved
The Câmara approved only a prior information request. -
Public consultation opens
The consultation runs until 29 September, with 417 submissions. -
Protest in Marés
About 100 people protest, joined by the mayor. -
Quercus's unfavourable opinion
-
No municipal interest
The municipal assembly unanimously declares the project of no municipal interest.
On the map
Documents and links
- Participa: UAB Abrigada (opens in a new tab)
- Executive Digest / Lusa: Uma centena pessoas em protesto contra central de biometano em Alenquer (opens in a new tab)
- O Mirante: Abrigada rejeita unidade de biometano a 500 metros das casas (opens in a new tab)
- Mais Ribatejo: Empresa com projetos em Torres Novas, Santarém e Benavente avança com central de biometano em Alenquer (opens in a new tab)
- RTVON: Assembleia Municipal de Alenquer contra instalação de central de biometano (opens in a new tab)
- Quercus: Quercus emite parecer desfavorável à unidade de Abrigada (opens in a new tab)
- O Mirante: Cresce contestação para travar projectos de biometano na região (opens in a new tab)
Sources on this page
- Uma centena de pessoas em protesto contra central de biometano em Alenquer
- Abrigada rejeita unidade de biometano a 500 metros das casas
- Assembleia Municipal de Alenquer contra instalação de central de biometano
- UAB Abrigada
- Quercus emite parecer desfavorável à unidade de Abrigada
- Empresa com projetos em Torres Novas, Santarém e Benavente avança com central de biometano em Alenquer