Public dossier Alenquer · Portugal Updated 16.10.2026

Abrigada biomethane plant (Marés, Alenquer)

Contested Environmental impact assessment; public consultation closed on 29 September 2026; decision expected in mid-2027. approximate location

A project by SGDT 1001, Unipessoal (presented as a Gás da Terra project) for about 84,000 t/yr of effluent and animal by-products, 400–500 m from homes. The Câmara gave an unfavourable opinion and the municipal assembly unanimously declared it of no municipal interest.

What we know

PromoterSGDT 1001, Unipessoal, Lda (projeto da Gás da Terra, segundo a imprensa)
LocationUnião das Freguesias de Abrigada e Cabanas de Torres (Marés), Alenquer (Lisboa)
Capacity ≈ 84,000 t/yr (230 t/day)
Feedstock Farm effluent and animal by-products
Distance to homes 400–500 m
Câmara's opinion Unfavourable
Public consultation 19.08–29.09.2026, 417 submissions

The plant would treat about 230 t/day (84,000 t/yr) of farm effluent and produce biomethane and a "biofertiliser", with a €20.5 million investment and about 7 direct jobs. The promoter expects the environmental impact decision in mid-2027.

The public consultation on Participa ran from 19 August to 29 September 2026, with 417 submissions. The Câmara Municipal gave an unfavourable opinion, citing undemonstrated odour control, road safety on the EN1/IC2 and the lack of analysis of alternative sites further from homes. Quercus also gave an unfavourable opinion.

The Movimento de Cidadãos de Abrigada, Marés e Ota gathered about 900 signatures on paper and 1,400 online, and about 100 people protested in September, joined by the mayor. On 24 September the municipal assembly unanimously declared the project of no municipal interest.

What has happened

  1. Prior information request approved
    The Câmara approved only a prior information request.

  2. Public consultation opens
    The consultation runs until 29 September, with 417 submissions.

  3. Protest in Marés
    About 100 people protest, joined by the mayor.

  4. Quercus's unfavourable opinion

  5. No municipal interest
    The municipal assembly unanimously declares the project of no municipal interest.

Local movement: Movimento de Cidadãos de Abrigada, Marés e Ota

On the map

Documents and links

All projects See the sources

Sources on this page

  1. Uma centena de pessoas em protesto contra central de biometano em Alenquer Executive Digest (Lusa) · 14 Sep 2026
  2. Abrigada rejeita unidade de biometano a 500 metros das casas O Mirante · 15 Aug 2026
  3. Assembleia Municipal de Alenquer contra instalação de central de biometano RTVON · 28 Sep 2026
  4. UAB Abrigada Participa · 2026-08-19 / consultado em 2026-10-16
  5. Quercus emite parecer desfavorável à unidade de Abrigada Quercus · 15 Sep 2026
  6. Empresa com projetos em Torres Novas, Santarém e Benavente avança com central de biometano em Alenquer Mais Ribatejo · ~2026-08-08